Download publication Download Issue 19 of The Altascientist to read about Schedule I Therapeutic Development.

Under the Controlled Substances Act (CSA) in the United States, drugs that have the potential to be abused are scheduled into one of five Classes or Schedules (CI-V) as controlled substances. The scheduling method makes a distinction between drugs that have abuse potential and are not approved for medical use (i.e., Schedule I) and drugs that are approved for medical use and have abuse potential (Schedules II-V). In the classification, the higher the number of the Schedule, the lower the abuse potential of the drug and the less restrictive the conditions regarding its distribution, storage, and prescribing.

Schedule I, or Class I (CI), drugs are currently restricted to research in the U.S., meaning that they are not approved for medical use, and are deemed at highest risk for abuse.

Recent research on psychedelics and entactogens, both of which are Schedule I, is beginning to demonstrate the potential therapeutic effects of these drugs for various medical indications. Approvals of such drugs for medical or therapeutic use will inevitably result in the rescheduling of these drugs from their current CI status.

In Issue 19 of The Altascientist, we review:

  • the regulatory environment and challenges (Drug Enforcement Administration
  •  the research site requirements associated with the development of Schedule I drugs for therapeutic 
  • required preclinical studies of Schedule I drugs
  • required clinical studies of Schedule I drugs
  • specialized clinical assessments of Schedule I controlled substances
  • formulation, manufacturing, and analytical considerations for Schedule I drugs

 

 

Preclinical Assessment of Abuse and Dependency Risks of Schedule I Therapeutics

In addition to safety pharmacology and toxicity studies for psychedelic compounds, abuse potential and dependence evaluation is necessary as part of the final proof of concept for preclinical research. Novel psychedelic drugs for medical use will have to undergo rigorous preclinical assessments to determine the abuse and/or dependence risks that they carry. Based on current evidence, the abuse risks posed by psychedelics are no greater or more onerous than those associated with CII opiates or stimulants. The potential therapeutic benefit and the capacity to properly assess and develop mitigation strategies add to the argument in support of further research on such compounds.

 

Formulation, Manufacturing and Analytical Considerations for Schedule I Therapeutics

Before any research can be conducted, the active pharmaceutical ingredient (API) has to be formulated and produced in an appropriate dosage form. Choosing a manufacturing partner that already has a CI license will reduce timelines, and ensure that the site has the expertise and experience to work with controlled substances. Once a license is in place for a particular substance, it remains in place as long as the site is in good standing with the Drug Enforcement Administration (DEA). Future projects will therefore be able to start quickly, with less logistical challenge.

The storage and handling requirements maintained by a Schedule I-licensed CDMO are rigorous, with CI material stored in a locked vault dedicated for this purpose, with secure, controlled, and limited access. Detailed records for vault access must be maintained and be available for audit.

 

Safety Considerations and Guidelines for Schedule I Clinical Studies

As with other new chemical entities (NCEs) entering clinical development, novel psychedelics need to be assessed for safety, pharmacokinetics, and efficacy. Given the drug class and associated risks, abuse/dependence evaluation is a central part of any drug development program. Because of the known serious safety concerns around psychedelic substances, extremely thorough, robust, and precise safety monitoring must be an integral part of the protocol, and the recruitment needs to carefully screen subjects for clinical research eligibility.

 

How Altasciences Can Help With Schedule I Therapeutic Development

For novel CNS-active Schedule I drugs, tremendous benefit can be achieved by engaging with a drug development partner that has Schedule I licenses across every stage of early-phase development. Integration across preclinical, clinical, bioanalytical, and formulation/manufacturing phases ensures complete continuity, data transfer, information sharing, and efficient, active timeline management. At Altasciences’ CNS Center of Excellence, you have a team of well-recognized experts to ensure that your psychedelic research and studies are conducted with the rigor and efficiency needed to meet regulatory requirements, and fulfill your drug development goals.

 


Explore all issues of The Altascientist in our Resource Center. And don’t forget to subscribe to “The Altascientist: Audiobooks” on Spotify, Apple Podcasts, or wherever you get your audio content.

 

Download publication